![](https://www.sazepi.com/wp-content/themes/sazepi/img/icon.png)
Fire safety in a mixed gas and diesel power plant in Melilla
DESCRIPTION OF PROYECT
The Melilla plant is a mixed gas and diesel power plant that has 6 generating groups with a total installed power of 60.1MW.
![Melilla](https://www.sazepi.com/wp-content/uploads/2015/09/melilla.jpg)
Melilla
SCOPE
SAFETY:
- Engineering, supply, assembly and commissioning of the extinguishing system in fuel and oil tanks and pump room by means of a foam agent
- Engineering, supply, assembly and commissioning of the fire detection system in fuel and oil tanks, pump room and electrical room
- Integration of the new fire detection centrals in the control system of the plant with its corresponding screens
DATA SHEET:
CLIENT:
![](https://www.sazepi.com/wp-content/themes/sazepi/img/li.png)
LOCATION:
![](https://www.sazepi.com/wp-content/themes/sazepi/img/li.png)
DATE:
![](https://www.sazepi.com/wp-content/themes/sazepi/img/li.png)
DURATION:
![](https://www.sazepi.com/wp-content/themes/sazepi/img/li.png)
BUDGET:
![](https://www.sazepi.com/wp-content/themes/sazepi/img/li.png)